Maintenance works on the old slipway.
Port Sudan
Welding works on the old railway carriage of the slipway.
Port Sudan
Strengthening the railway with “concrete pillow” under the waters.
We had to block the waters of the sea in order to achieve this successfully.
Main Winch Room
Before
After
Railway Carriage
Before
After
The overhauled slipway was expected to take up to 300t. We lifted and maintained boats up to 500t.
Some of the machines delivered to Port Sudan with personnel training.
Main Compressor Room, before and after new installations.
Ship Engines repair and overhaul